Product Details:
Minimum Order Quantity | 1 Unit |
Service Type | Land Protection |
Coverage Area | >1000 Square Feet |
Need AMC | no |
Service Location | Any Where in India |
Service Duration | 1-12 Months |
Service Mode | Offline |
Under the guidance of our experienced professionals, we have been able to offer the commendable range of Environmental Clearance Services to our valuable clients. Also, our offered clearance services are done by knowledgeable personnel, who enable us to perform the exact specifications of our customers.
Product Details:
Minimum Order Quantity | 1 Number |
Type Of Service Provider | Consulting Firm |
Type Of Ownership | Private Limited |
Type Of Industry | Manufacturing |
Type Of Services | Both Online & Offline |
Company Type | Pvt Ltd |
Type Of Service Contract | Retainer Based |
MIDC vide it's Circular No. MIDC/CP/A71118/2016 dated 04 Mar, 16 emphasized on ‘Implementation of Building plan approval through Auto-DCR’, by giving reference to its earlier Circular no. MIDC/CP/A42501/2016 dated 08/02/2016 vide which all the SPA’s were directed that all building permissions shall be processed only through web-based software solution (Auto DCR) integrated with Single Window Clearance and no proposal shall be accepted manually.
BETPL have all team of experts and experience to provide Architectural Services for getting MIDC Provisional Fire NOC and MIDC building plan approval
1) To provide architectural services by MIDC approved Architect for getting MIDC Provisional Fire NOC and MIDC building plan approval for factory premises
2) To prepare Architectural drawings as per MIDC Format required for Building Approval purpose at MIDC and Fire Dept.
3) To get Drawing Conversion at AutoDCR
4) To submit online application for AutoDCR- Building & Fire Approval Integrated with SWC
7) To get Scrutiny By Central Scrutiny Team for Building & Fire Approval.
8) To submit fire protection scheme to Fire Dept. and attend queries.
9) To get Provisional Fire NOC from MIDC Fire Dept.
10) To get DOCUMENTS VALIDATION & BUILDING PLAN SCRUTINY Documents Verification and Compliance and attend queries at Competent Authority
11) To get Building Plan approval by Competent Authority
Product Details:
Type Of Industry / Business | consulting |
Location | mumbai |
Type Of Service | Both |
Project Duration | 90 days |
Number Of Employees | 25-50 |
Type of firm | pvt ltd |
PESO is established by Government of India under Department for the Promotion of Industry and Internal Trade under Ministry of Commerce and Industry, to administer Explosives Act 1884, Explosives Substance Act, Petroleum Act 1934, Inflammable substance Act 1952 and Environment Protection Act 1986 to control import, export, transport, storage and usage of explosive materials, Flammable materials, pressure vessels, cryogenic vessels, design and installation of all necessary and relevant infrastructure etc.
We provide all necessary guidnce, documentation and services for the PESO approval.
Additional Information:
Product Details:
Minimum Order Quantity | 1 Year |
Usage/Application | Consent approval |
Cost | 200000 |
Type Of Service Provider | Consulting Firm |
Type Of Ownership | Private Limited |
Type Of Industry | Environment Engineering company |
Type Of Services | Both Online & Offline |
Company Type | Pvt Ltd |
Type Of Service Contract | Retainer Based |
To give Technical Services To get Consent to Establish / Operate form MPCB
1. To visit site
2. To study the existing activity at the site
3. To study details of operations, pollutants and the quantity and means of disposal.
4. To collect the necessary data for preparing application of MPCB Consent
5. To refer to Environment Protection Acts and Rules and EIA Notification advise DOW and prepare data as required at application of MPCB Consent.
6. To apply on-line for MPCB Consent
7. To attend and assist in technical discussions with MPCB for their clarification regarding Consent Application
8. To get MPCB Consent to Establish/ operate from MPCB as mentioned above.
Note: Consent to Establish in case of proposed unit as fist step. Then Construct factory, implement consent to establish conditions and apply and get Consent to operate.
Additional Information: